how to calculate concrete quantity for footing using M25 grade
1:1:2 for 730cft.
Answer Posted / mohammed aijaz hussain
Volume of Wet concrete = 730 cu.ft. = 20.68 cu.m.
Volume of Dry concrete = 1.75 X 20.68 = 36.19 cu.m.
Volume of cement = 1/4 X 36.19 = 9.048 cu.m.
= 258.5 Bags
Volume of Sand = 1/4 X 36.19 = 9.048 cu.m.
Volume of Aggregate = 2/4 X 36.19 = 18.095 cu.m.
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
what is tension column?
What is the difference between built area and super built up area?
how much need sand and cement for 1 cft roof construction?
WHAT GOAL DO YOU HAVE IN YOUR CARRIER?
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
rate analysis hiring of generator 62.5 KVA
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
what is kribs is supporting?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
150mm bricks size how many use 4.14 m3
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?