How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / mohammed aijaz hussain
Volume of Dry Mortar = 35% of volume of Brickwork
Volume of Mortar required = 0.35 X 1 = 0.35 cu.m.
Cement required = 1/6 X 0.35 = 0.058 cu.m. = 1.67 Bags
Sand required = 5/6 X 0.35 = 0.292 cu.m.
Bricks required = 500 Nos.
Is This Answer Correct ? | 64 Yes | 45 No |
Post New Answer View All Answers
What glue is least sticky?
to minimize budget cost of building , what can i do
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
Explain how you can turn off the display for dimension in CAD?
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
how much repeitation for conventional and maivan formwork?
can i get hindi version of is codes based on civil engineering?
How do you calculate load bearing capacity of a waffle slab?
how to calculate the scour depth
if dia of inner circle is 42 m and depth is 1.5 m and width is 1 m ,then whait is the quantity of steel?
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
What materials were used to build the golden gate bridge?
What is thumb rule in quantity and cost estimation of a residential building?
Which is stronger solid steel rod or hollow steel pipe?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting