What are 4 parameters between node A and node B, to bring a
PCM link up between them.

Answer Posted / sumit kumar

the four parameters between node A and node B, to bring a
PCM link up between them are
1.DPC(Destination Point Code) and OWNSP

2.Signaling Link set.

3.Network ID(NAT0 & NAT1)

4.PCM channel on which link is creating

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the role of a health and safety representative?

1958


What is the name of the occupational health and safety act in NSW

1896


What is non verbal communication?

2054


What is optical character recognition?

2409


What is the role of health and safety committee

2175






what is the postec controllers and how it is work

2364


Hi friends,could sombody plz suggest me the website of History with audio (which can be hereable)plzzzzzzzzzzzzzzz help. Because i m going to appear WBSSC exam very soon its improtent.Plz send me to (mahato_hira@rediffmail.com)

2221