A role is assigned to 100 users and for one day only 10 users need to be able to access that role and the other 99 users should not have access. How do you do that?
Answer Posted / lalit kumar
PFCG- go to the role and delete all the user except 10 whom
you want to assign the role.
Is This Answer Correct ? | 14 Yes | 0 No |
Post New Answer View All Answers
Explain kernel upgrade?
How to set predecessor relationship between two transport requests?
Explain what is luw (logical unit of work)?
I am installing a sap j2ee engine at crm. When it reaches phase 22 it halts for more than 10 minutes and gives up starting the system. What should I do?
If client copy is stopped in middle, what happens if you want to start it again?
What is luw (logical unit of work)?
Where do you check transport request logs?
How you can assign an object to 100 roles at time?
what is the difference b/w 4.6c & 4.7EE?
What is sap market place?
Explain what is heterogenous system copy and homogenous system copy ?
1)Have you used performance tuning? What major steps will you use for these? 2)In production what is the user exit? 3)What type of user exits have you written? 4)Difference between Search Helps and Match Codes 5)On which even we can validate the input fields in module progams? 6)what are the table controls in BDC ? 7)what is the difference between bdc and lsmw ? 8) If the scripts are client dependent, what above driver program ? (client dependent / independent) 9). I have two pages, In one page I want address, Header, Main & footer. In the second page I want only Main. How to do it? 10) Will 50,000 records be uploaded directly into APP's Server? 11) What is the button to change the variant in ALV ? 12) If your project is support project ? when is your implementation has completed ? 13)In start of selection, if we perform validation, what happens ? 12)How to join 3 tallies & looping. We have developed a program in a client say (200- client) and 210 has test data. No developing rights. How to test data? 13)How to transfer data which is coming from are report as output to another report 14)How to create standard text and how do u transfer it ? 15)What are the views when we are creating Material ?
What will you do if u got Update failure?
Error in the phase import_proper while applying support packages?
Example you have 6 sap application servers, I want to monitor all the application servers. How to configure a CCMS?