We get an error message "Control parameters for scheduling
not defined" while creating test production Orders. Why?
Answer Posted / guest
Before you attempt creating Production orders, configure your
Order types- Transaction Code OPHJ
Order type Dependent parameters - Transaction Code OPL8
Backorder Scheduling - Transaction Code OMIH
Scheduling Levels - Transaction Code OMIF
Is This Answer Correct ? | 3 Yes | 5 No |
Post New Answer View All Answers
Difference between Item categories or what is variable size item or non stock item.
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
What is Material status and which view of the material master it is available?
What is 'capacity planning'?
Mention what is the t-code for changing production order and to display production order?
What are all the steps involved in Variant Configuration?
What is alternative BOM, or diff between BOM group and Group BOM?
What do we do in the realization phase?
In the monthly lot size proc, how to generate lot at the end of Period?
Difference between plan cost, Actual cost and target cost.
In cost controlling information system mention the fields that are listed in the list screen of the report?
Control keys
How to move to the realization phase?
SPRO path for order, confirmation or requirement class.
What is the use of infogroups?