Answer Posted / mobeen ahamd
material master
bom
routing
workcenter
mrp
Is This Answer Correct ? | 2 Yes | 4 No |
Post New Answer View All Answers
What is the use of mrp list?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
What is time phased Planning?
What is MTS and MTO and the difference between them?
Where have we to specify the teardown time in one operation?
Explain the uses of the simple maintenance interface?
What is the use of mrp pp evaluations?
What is it 41 used for?
Explain why their is need of production version ?
How is indian slab and us slab?
What is Individual and collective requirements and differecne between them in MTO scenario?
Which MRP types you have used?
How to attach a drawing for a material to bom ? Is it possible ?
suppose we have sales order-40, PIR-25,warehouse stock-40, so when we run mrp,what quantity the system displays with MTO & MTS. How?
Explain PI sheet.