what are the basics of PP ?

Answer Posted / mobeen ahamd

material master
bom
routing
workcenter
mrp

Is This Answer Correct ?    2 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the use of mrp list?

549


Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN

4314


What is time phased Planning?

1311


What is MTS and MTO and the difference between them?

1939


Where have we to specify the teardown time in one operation?

600






Explain the uses of the simple maintenance interface?

637


What is the use of mrp pp evaluations?

670


What is it 41 used for?

576


Explain why their is need of production version ?

616


How is indian slab and us slab?

638


What is Individual and collective requirements and differecne between them in MTO scenario?

1592


Which MRP types you have used?

1394


How to attach a drawing for a material to bom ? Is it possible ?

630


suppose we have sales order-40, PIR-25,warehouse stock-40, so when we run mrp,what quantity the system displays with MTO & MTS. How?

1882


Explain PI sheet.

1413