what is the definitions of Roll In Time,roll Area, Roll Out
Time And Wait Time,Please reply needful
Answer Posted / prasanta
Roll in time - the user context is copied from the roll
buffer into the roll memory ( shared Memory) of the
instance to which the user is logged on.
Roll Out Time - At the end of the dialouge step the work
process writes the user context back to the roll buffer
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
When should we use Transactional RFC?
What are the different options available for scheduling a background job? What start conditions type can be used?
What are the key responsibilities of sap basis administrator?
you want to do a system-copy. List the steps you will take.
What is “data sets” in sap?
what is the common storage file for oracle ?
What is the use of Trusted system? I know that there is no need of UID and PWD to communicate with partner system. In what situation it is good to go for Trusted system?
What is JVM switch. Why JVM switch is required ?
What are the DVD's Download for implementation?
How do you solve oracle archive struck?
List the difference between asynchronous and synchronous transport?
What are the activities you done in EP?
How to apply job on OS Level?
At o.s level where to check for system logs of sap application?
Can you tell me installation procedure of SAP on UNIX