Answer Posted / joy
The MRP Types is found in the Material Master Record.
The MRP Types is used in the Material master to determine
how a material is planned for automatic reorder point
planning, manual reorder point planning or forecast based
planning
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the docu.flow?
Where do we can find pricing procedure indicator in sd ?
What is the structure of delivery document?
1) What are the Stock transfer configuration steps ? 2) What is a function of account group except partner fuction creation ? 3) Tell me some critical Gaps(not basic one) which u faced in project and how u solved it ? 4) Tel me about u r bisiness flow and sales process ? 5) What is formula in pricing ? 6) What is a difference between Make to stock and Order to cash ?
What does the term “business area” refer to and how can it be used?
I am in the va02 transaction for a sales order and want to reject the line items and cancel the entire sales order. What is the menu path needed to achieve this goal?
What are the effects of posting goods issue?
Explain what is the difference between sap credit memo request and sap credit memo?
What are the various qualifier option or what are the various import options? : transportation management
What are the views in a material master?
In Order - what have you done exactly, did you do the entire setup in SAP, and if yes, can you walk me through it?
What is document type?
Is it possible to assign two different sales organizations to the same company code?
Where is the logic that controls this and how do we change it?
can some body give me some idea on integrations of sd and sap crm service