how to write testcase for toaster?

Answer Posted / sivanathan

1. First get the specifications for toaster,
a. like is it for India or abroad.(Voltage is 240 V and 110 V).
b.HOw many bread must be toasted.Is it 2 or 3.And under what
stipulated timing
2. Define the major objective.Bread must be toasted and be
edible and taste good for eating

(IF in interview,the interviewer to assume generally).

Start writing the test conditions:
1.The slot given for inserting bread should provide enough
space for bread.
2.If test 1 passes.Insert bread and press toast button.the
toaster must toast the bread in the stipulated time and pop
the bread out.The bread toasted must be edible.

(We can derive so many test condition,such as We can have
options line ordinary bread,wheat bread,etc and also is the
bread toaster insulated.)

Now write testcases

Test Case id:1
Test Case description:
Should be able to insert the bread inside the toaster.
Preconditions:
None
Steps to execute:
1.Take a bread from the bread packet.
2.Insert the bread into the toaster's bread slot.

Expected result:
The bread should go inside the toaster smoothly.The bread
should be vertical and the vertical angle should not be more
than 5 degress and less than 0 degrees.

This is just an example and a very good one.It is really
interesting.I am happy that interviewers ask such question.

Is This Answer Correct ?    10 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the advantages of automation over manual testing?

698


Can you explain the pdca cycle and where testing fits in?

778


how is market for testing in banglore,chennai,pune,delhi?

1708


Plz give me manual testing real test case ?

1032


Explain about PET Model?

2235






could any body plz let me know which is best training institute for telecome testing in hyderabad?

1521


Hi If anyone from banglore want to know the real time senario like writting Test cases and how things actually happens in a company. I am taking a 2 hours class which will cover all the real time experiance and guidence for job. classes are counducted only at weekends. for further queries mail me at vinodhanandhan@gmail.com Vinodh Anandhan Software Test Engineer vinodhanandhan@gmail.com

1468


What is the most important phase in STLC and Why

1169


What are joins and subjoins in the data bases what is data driven testing what is verification and validation What is Quality Assurance (QA) and Quality Control (QC) Is Verification is related to QA and Validation is related to QC ? which type of model you follow basically in your project what is a use case How to test a Bike how to test a Lift (Elevator). which configuration Management tool do you use which Bug tracking tool do you use explain Bug life cycle what is Regression testing what is ALPHA testing ans BETA testing What types of testings comes under Non functional testing what is TEST DIRECTOR what is CMM and CMM i whar are Expressions in Winrunner What is a Compile module Is it Necessary to open the tool first or the application first after getting a bug what will you do if you add a new object or a new module for the existing application then how will you test the application which Defect tracking tool do you use what is change management What is smoke Testing what is sanity testing A application is given to you but the requirements and functionalities are missing what will you do to start the testing which testing documents will be received by the client

1922


could anyone explain application testing in sequence order i don't have any experience in that

1517


MS Paint

1649


What are the RBI rules has to follow by a bank for online precesseing. ?

1721


what is diffrence between dynamic black box testing and dynamic white box testing

1564


How can data caching have a negative effect on load testing results?

2375


Explain stub in testing point of view?

708