What is the difference between sanity testing and smoke testing
Answer Posted / narayana
smoke testing is test whether the build is installed
properly or not and is ready for further major testing.
Sanity testing is carried after smoke testing to check
whether the major functionality is working properly or not
to proceed further testing.
for ex: when a build is passed the smoke test, the sainty
test is conducted on it by just navigating to the hyper
links,or major functional whether the links are opening
properly or not.Here there is will be using more critical
test cases for testing the Sanity testing.
Is This Answer Correct ? | 15 Yes | 1 No |
Post New Answer View All Answers
What is ecp (equivalence class partition)?
List the considerations in developing testing methodology
how deployment phase of SDLC differs in product based and in service based company ?
Hello testers I am an Bsc Hotel mgmt Degree holders but now am doin my software testin programme, side by MCA Master degree an have 6 months exp i testing in company.. i want to change my CV according IT based. so can anyone help me with sendin any sample CV of urs.. do me this favour it wil be very helpful for me prepare CV for interviews....
What are tools of performance testing?
how to connect oracle with test director? in testdirector we will be getting only reports? pls answer Thanks in Advance
What will be your approach if a particular script in Load Test fails?
Describe your experiences with code analyzers.
In a systen design to work out the tax to be paid: An employee has Rs 4000 of salary tax free. the next Rs 1500 is taxed at 10% , the next Rs 28000 is taxed at 22% , any further amount is taxed at 40% , the nearest whole Rs, which of these is a valid boundary value analysis test case ???? a)Rs 1500 b)Rs 32001 c)Rs 33501 d) Rs 28000.
what s test block ratio? please any one answer me..
What is system level testing?
How do you perform configuration management with typical revision control systems?
Explain stub in testing point of view?
What is the difference between Sleep and wait in winrunner what is integration testing and types of testing present what is system testing what is data driven testing what is functionality testing if requirements are given to you then how do you write the test cases for it Account number = Ok cancel For above given form the valid account number starts from 1 to 1000 so is it necessary to input the 1,2,3 ….998,999,1000 test cases to check the conditions of valid account numbers I,e is it compulsory to write 1000 test cases for the above form
If we have no srs, brs but we have test cases does you execute the test cases blindly or do you follow any other process?