hi,
how would i run job1 then job 3 , then job2 in a sequence of
job1 ,job2,job3.

Thanks
sunitha

Answer Posted / nannesaheb

First We can Create the job sequence for Job1 and Job3 then
set the scheduling time first,then we can create the job
sequence for Job2 then create the sequence as required
format then run the job. then we should get required result



----Nannesaheb
8807423181

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How will you load you daily/monthly jobs datas in to Fact and Dimension table using datastage.

2995


What is the difference between operational data stage (ods) and data warehouse?

678


In work load management there are three options of Low priority, Medium priority and High Priority Jobs which can be used for resource management. why this feature is developed when there is already jobs prescheduled by scheduler or autosys. what will be the use of workload management then?

1053


Define Merge?

880


What is datastage?

649






what is the use of materialized view?

967


1.what is repartionoing technique? 2.what deliverables transferred to client using datastage? 3.how to write loop statements using nested loop sequence?

1808


how to export or import the jobs in .ISX file

722


What is data partitioning?

745


how to add a new records into source?

1532


Where do the datastage jobs get stored?

736


What are the processing stages?

644


What is the process of killing a job in datastage?

593


Define ds designer?

768


What is aggtorec restructure operator?

729