I've one slab of 24m x 43m. How to calculate required steel
For this slab.
Answer Posted / arsh
No. of bars*Total Length*(Dia of bar)^2*(1/162)
The answer will be in kgs.
Is This Answer Correct ? | 12 Yes | 5 No |
Post New Answer View All Answers
how much used soil in 1 brick of standard size?
Which are the top apps for you civil engineer?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
How much quantity of cement,sand,stone used to build 1 cum of cc road??
What is the largest concrete dam in the world?
how many time use of plywood shuttering and IS code
how many types of survey and what are levelling instrument?
Which is the most prominent tower of world?
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
what is shuttering co efficient?
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
What are the advantages of cad?
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
Basic questions of civil engineering