I've one slab of 24m x 43m. How to calculate required steel
For this slab.

Answer Posted / arsh

No. of bars*Total Length*(Dia of bar)^2*(1/162)
The answer will be in kgs.

Is This Answer Correct ?    12 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much used soil in 1 brick of standard size?

1575


Which are the top apps for you civil engineer?

725


Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.

1328


How much quantity of cement,sand,stone used to build 1 cum of cc road??

1327


What is the largest concrete dam in the world?

691






how many time use of plywood shuttering and IS code

2692


how many types of survey and what are levelling instrument?

1560


Which is the most prominent tower of world?

634


How to calculate cement and river sand material Qty for waterproofing base coat and finish coat

1889


I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.

2054


what is shuttering co efficient?

1304


what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?

2632


What are the advantages of cad?

643


HOE TO YOU PLAN TO ACCHIEVE THE GOALS?

1681


Basic questions of civil engineering

1621