How do you find the weight of rod per metre lenth ?
Answer Posted / viswa
stupid santosh, don't guide people wrongly
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
What is difference between code and standard and specification?
what r the precaution for high in atp tempareture,low in atp tempareture
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
how to find out hard strata in bored pile when the DMC method adopted.
Define What is a kip?
how to absorb to site basic corrections? which are the important correction?
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
i need gate exam civil engineering question papers with answers
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
how many spacers we need for 1 ton reinforcement? aprox.
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
what is flashing?
How to calculate steel for beam slab and column