If a background job runs more than the time it should be
completed normally then what action will u take ?

Plz Post the Answer

Answer Posted / chinna

First of all check whether the job has ran previously ,
check the history of that job. If it is taking more time
than the previous try checking the background work
processes, check the load and generation time, check the
buffers and increase it accordingly.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How do I know what threshold values to set

1583


When should we use Transactional RFC?

651


Is there any report or table in which user log off time is stored in sap?

679


If a user complaints that he could not execute some of the transaction codes then what will you do?

612


how can we set a/r a/p netting for inter company code transactions? is it possible to do? if yes, give the solution?

2000






I also wanna work with Webdynpros? What are the requirements? I mean SAP 4.7 ee or ECC 5 or 6? Netweaver developer Studio? Also with win 2003 i have the activation problem every month. SO do i get a cd that doesnt ask for the activation? i have win 2000 but can it be installed on HP pavilion laptops that are coming preinstalled with Vista OS?

1869


What is the difference between st06 and st03?

1285


Explain the developer trace?

600


I need to change the Company address parameters of a user. The path is SU01 -> -> Change - > Address Tab - > Display Icon in Company Address section. In the new screen, i see a preview section icon; on clicking which, I can change the parameters such as "Sending Country"; "Street/PO Box number" and number of lines in the resulting pop up. Here though i change the parameter "Street/PO Box number" field to 'S' ( Street has priority over PO Box), its changing again to 'P' (PO Box has priority over street) only. In the help section it is written that if we set the user parameter (tcode SU3) LND1 to the desired country we can control the user specific Sending Country with the desired value else it takes the Sending Country of the Company defined by default. But no such parameter has been given for Street/PO Box number so that we could change its value atleast there. Someone suggest me how to change the Street/PO Box number of the Address format for a user to the desired value.

4414


How you connect ECC to EP?

1602


How to delet a table in sap. How to move a table from one location to another.

1803


How to deactivate IPC in standalone CRM.

2572


Can anyone forward me EP faqs to the following mail id: hakeem99khan@gmail.com Thanks in advance

2123


Where will u find transport error logs?

1621


i am arun, as of now i am working in a power plant. I did B.E mech and have completed PGDC in thermal power plant engineering from NPTI(NATIONAL POWER TRAINING INSTITUTE). I started my career in software oly , as i dono any software languages i got failed in conformation exam. Pls help me , i want to enter software field. in this powerplant field 6 working days for week and holiday is also not sunday, i am not able 2 tc of my family... pls help me how to enter sf fielf. my frds sujjested me 2 try as functional after 2 years. wats the procedure for that... pls pls help me in this issue I have 1 year exp in power plant, i knew mechanical design software. my id : arun0029@gmail.com

1669