Answer Posted / narendra
1 cement
5 sand
10 Aggregade
Is This Answer Correct ? | 23 Yes | 1 No |
Post New Answer View All Answers
detailed calculation of the amount of cement used?
whats is difference between anchorage length and development length
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
What are the basic use of runners and standards of pipelines?
How to calculate chejja reinforcement
Define What does civil status mean?
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
What is the strength of cement?
What is thumb rule in quality and quantity estimation of a Residential building??
3. What are the disadvantages of your present job, things you do not like about it?
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
How much cum. Brick work can do by 1 madon
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.