what is period of de-shuttering for different area of slab
of M25 grade?

Answer Posted / m.haseeb yaquobi

28 days

Is This Answer Correct ?    4 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?

670


Can we apply curing compound on ceiling (slab Bottom)

366


What are advancements in civil engineering?

650


que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?

2031


How is improve my knowledge in construction industries....

1669






What are the applications of the modulus of elasticity?

663


What is the cost difference between site mix and ready mix concrete per cubic meter

1441


what do you understand by M25 concrete

1930


I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

1412


what is the percentage of silt in black cotton soil.?

1960


need to join coaching institute in coimbatore tamilnadu ......say me the best coaching for IAS

1424


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

916


How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.

1801


significance of specific surface area of particles?

1640


what are the challenges of being a team leader and a supervisor?

3344