what is period of de-shuttering for different area of slab
of M25 grade?
Answer Posted / n.c.pathan.
It depends upon the span of the slab. For spans less than
6m we can remeve the props after 14 days and in case of
spans exceeding 6m we can remove the props after a period
of 21 days.
Is This Answer Correct ? | 30 Yes | 5 No |
Post New Answer View All Answers
What is the meaning of soil reinforcement?
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
Define What is the distance between railway tracks?
What is the worlds largest concrete dam?
what is yield and tensile strength of steel, if steel has yeilding strength of 60 psi than how much its tensile strength?
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
Which prize is the alternative to the NOVEL Prize?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
What do you meant by gui?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
any book or article on pumped concrete.