How is access seq. controlled?

Answer Posted / ashish

Hi Frds,
Basically Acess Sequence is a Search Strategy which governs
the condition type which give the required result. So to
Acess sequence is controlled by set of Acess Number which
which are assigned to condition tables in which specific
condition data is stored. ex. : table 6 has Price List
Type/Currency/Material record. so whenever the specific
requirement comes this acess sequence can be attached to
our condition type an it can act as a path setter to
fulfill the requirement.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the relation between credit control area and company codes and explain the credit control area?

647


what is the main purpose of maintaining the master data?

598


When the system checks availability which scheduling would it use first?

636


Steps of tax determination?

1851


Explain what is sql override for a source table in a mapping?

596






What is the difference between pgi cancellation and returns order?

637


Can anyone tell me the link for interview question for SD module. . . As i m fresher so i really need to know what sort of question i will to have face during interviews . . . .

1543


How many pricing procedures you have configured in the system and what are their purposes?

580


Can I view the invoice due date (jan 16, 2006) in the invoice?

613


Does sap transportation management come bundled with geographical information systems (gis) capabilities? : transportation management

605


What is the client no of SAND BOX.GOLDEN CLIENT, UNIT TESTING,ENDUSER TRAINNING AND PRODUCTION SERVER?????

1695


the condition type DIFF is not triggered in sales order.in the sales order if 2 line items are there from two different plants.for one material it is showing error but for the other it is working fine.what could be the reason?

2139


What are mrp types?

722


Define the material taxes in ovk4, which will then be maintain in material master.

699


At what places availability check performed? is it done at invoice level also ? if yes what are the scenarios to perform availability check at invoice level? what are the settings to be done to perform to check at invoice level?

1132