Checking Group for Availability Check
This field has two uses:
1. Specifies whether and how the system checks availability
and generates requirements for materials planning.
2. In Flexible Planning, defines - together with the
checking rule - the different MRP elements that make up
this key figure. The sum of these elements gives the key
figure.
Use 1: Availability Checking and Materials Planning
Use
The value you enter for use 1 (see above) is a default
value which defines:
Which MRP elements (for example, purchase orders,
reservations) the system includes in the availability check
Whether the system checks availability only until the end
of the replenishment lead time or whether it checks
availability over the entire period for which MRP elements
exist
Whether the system generates individual requirements or
summarized requirements if you enter sales orders or
deliveries for the material
Use 2: Flexible Planning
Dependencies
If you use this field to define the MRP elements of a key
figure for Flexible Planning, you must also select Document
KF in the Customizing parameters of the information
structure.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Diff between business sale cycle nd customer sale cycles?
What is the purpose of 'output determination'?
Can any one explain how we will configure milestone billing , periodic billing and which scenario we will use?
Is there an user exit to copy the data into planning table?
I have a scenario where the our unit of measure is Pc. The conversion is 1pc = 2.9768 m2. Now the client is saying that he will give the prices in Cubic meter. The current requiment is we have to derive a conversion ratio between pc (m2) and cbm. Please advice.
During route determination the system also needs to know the departure zone of the goods to be shipped. How does this information come into the sales order?
Tell me a customization which you have done & worked for your client which is not in standard SAP settings? Explain the requirement along with detailed procedure & process,t- codes if any from your real time data in your project? This question is most frequently asked in many interviews.Please reply asap... Urgent!!!! Waiting for your response eagerly... Thanks in advance
Can you 'block' a transaction for a material that is 'flagged for deletion'?
Explain what is sql override for a source table in a mapping?
Which organizational element is central in shipping? Give a definition of it.
what are the organizational elements required for the sd transactions
What is meant by condition technique? Can we say it is the combination of condition types, access sequence and condition tables?
At which levels in the sales document can you have different incompletion procedures?
What is the 'consignment stock process'?
Can you explain the modern technologies in sap? Do you use this in your current project?