Approximatly how many enduser can use the each bo project?
Answer Posted / manoj
it can be 1000,2000. All depends on requirement and
configuration,server sizing etc that has been done in the
project. Cannot be estimated how many users will access.
All depends on license also.
Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
I have 2 doubts regarding the "Input Control" functionality in BI4: 1) Can the Input Controls in BI4 be manipulated? I mean, can we change the IC display as BOLD or change the values from Italics to regular? Or change the colors? 2) How to get hierarchy type control in IC? Let's say my first IC is for Country and second is for State. If I select a particulat country from Ist IC,second one should show me states belonging to selected country. Is that possible? Thanks in advance!!!
What is the difference between user and versatile user?
Migration of Reports from business objects 5.1.5 to samee version in different hardware?
what is the difference b/w the refresh and buffered data?
Did you face any problems while creating reports? Name? Solutions?
what are the day to day activities of BO administrator ?
Explain how to execute the plsql procedure from the report by clicking with mouse?
Can anybody tell me what are the tuning problems?
What are the steps to be taken to schedule the report?
Explain what task is 98% of the required work of a business analyst?
What are the join problems comes appart from loop,chasm & fan Traps
How much data hold in one universe 336 can any one explain about core dimension, balanced dimension, and dirty dimension?
What is a bo repository?
IN THE REPORT I WANNA APPLY HYPERLINK FOR A CELL IN THE COLUMN/ROW HOW TO ACHIEVE THIS? EG: YEAR COLUMN : 2001,2002,2003,2004 I WANNA APPLY FOR 2001 ONLY
Hi, I would like to know how is the integration if we want to use Oracle Essbase as the Cube Engine, and present the Cube by Business Objects Presentation Layer? Can Oracle Essbase be integrated with Business Objects? Thanks,