Answer Posted / prabhu
Where both BOM component and BOM header materials are same.
This concept is frequently used in chemical industry
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
If u maintain sub-contacting where and how will be reflect
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
What is known as 'demand management'?
Explain the process of Material costing.
What is processing class, where we do them and why?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
You want to insert an inspection check point at the end of an operation. How would you do that?
What do you mean by pooled capacity?
What is scope of planning?
What is 'capacity planning'?
What are all the steps involved in Variant Configuration?
what do you mean by planning time fence
What is Auto GR?
What is internal payroll process?
Explain about rough cut planning