units digit in expansion os 2 raised to 51 is:
2 4 6 8

Answer Posted / pradip dharam

See Unit(2^5) = 2
51 / 5 = 10 and 1 rem

Unit(2^10) = 4

4*2=8

Is This Answer Correct ?    17 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

There's a camel living in a desert. There is a market 1000 miles away. The camel has 3000 dates for sale. It has to take the date to the market. But for that hte camel eats one date per mile. How many dates the camel can trade?

811


what is the sum of 7 consecutive odd numbers with 27 as the fourth number

782


A certain street has 500 buildings. A sign-maker is contracted to number the houses from 1 to 500. How many zeroes will he need?

1322


In a storage stall of 5x3x2inch.How many blanks of size 2x1x1inch can be stored..

1467


Length and breadth of a rectangle are in ratio 7:5. If length is reduced by 5 and breadth by 2, area reduces by 65. Find length and breadth.

899






12 men can build wall of length of 12m in 10 days how many men are required to build 20 m in 15 days.

788


a train runs first half of the distance at 40 km/hr and the remaining half at 60 km/hr. What is the average speed for the entire journey?

906


a man works. He has to maintain 100 cups. He gets 30 ps for every cup he safeguards and has 10 pay 90 ps for every cup he breaks.if he earns rs.24 per day, how many did he break?

795


A worker pay Rs20 a day ,he works 1,1/3,2/3,1/8,3/4 in a week.What is the total amount paid to the worker.

796


In a triangle, the average of the two angles is 56 degrees where as their difference is 24 degrees. What is the measurement of the biggest angle of the triangle?

678


Y catches 5 times more fishes than X. If total number of fishes caught by X and Y is 42, then number of fishes caught by X?

812


debentures book building

1734


Financial aptitude

698


A & B can do a piece of work in 21 & 24 days respectively. The started to work together but after some days BA leaves, B completes the remaining work in 9 days. After how many days does A leaves

732


Low temperature at the night in a city is 1/3 more than 1/2 hinge as higher temperature in a day. Sum of the low temp and highest temp is 100c. Then what is the low temperature

818