What steps are needed to develop and run software tests?
Answer Posted / guest
Hai
The following steps are needed to develop and run software
tests:
1.Obtain requirements, functional design, and internal
design specifications, user stories, and other
available/necessary information
2.Obtain budget and schedule requirements
3.Determine project-related personnel and their
responsibilities, reporting requirements, required
standards and processes (such as release processes, change
processes, etc.)
4.Determine project context, relative to the existing
quality culture of the product/organization/business, and
how it might impact testing scope, aproaches, and methods.
Identify application's higher-risk and mor important
aspects, set priorities, and determine scope and
limitations of tests.
5.Determine test approaches and methods - unit,
integration, functional, system, security, load, usability
tests, etc.
6.Determine test environment requirements (hardware,
software, configuration, versions, communications, etc.)
7.Determine testware requirements (automation tools,
coverage analyzers, test tracking, problem/bug tracking,
etc.)
8.Determine test input data requirements
Identify tasks, those responsible for tasks, and labor
requirements
9.Set schedule estimates, timelines, milestones
Determine, where apprapriate, input equivalence classes,
boundary value analyses, error classes
Prepare test plan document(s) and have needed
reviews/approvals
10.Write test cases
11.Have needed reviews/inspections/approvals of test cases
Prepare test environment and testware, obtain needed user
manuals/reference documents/configuration
guides/installation guides, set up test tracking processes,
set up logging and archiving processes, set up or obtain
test input data
12.Obtain and install software releases
Perform tests
13.Evaluate and report results
14.Track problems/bugs and fixes
15.Retest as needed
16.Maintain and update test plans, test cases, test
environment, and testware through life cycle
K,Byeeeee
Thanks & Regards
B.Ramyasri
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
hi can anyone tell me about vision plus testing? and what about its future
what is dib format?
How can software qa processes be implemented without stifling productivity?
How to do security implementation for any URL??
what is diffrence between dynamic black box testing and dynamic white box testing
What is the first test in software testing process?
When to stop testing? (Or) how do you decide when you have tested enough?
What is the Myers Boundary Table?
What is 'Account Conditioning'?
What is an entry criteria?
What is a code walk through?
How can we test for drastic (severe) memory leakages?
There is only requirements document. You have 10 days and 8 resources to release the system.At the end of the 8th day u tell ur TL that system is ready for release. How will you proceed with the testing process or in other words what all approach you will follow once you get requirements
Scenario-based testing Option 1 concentrates on actor and software interaction Option 2 misses errors in specifications Option 3 misses errors in subsystem interactions Option 4 Both 1 abd 2
What are the main key components in web applications and client and server applications?