hi,
how would i run job1 then job 3 , then job2 in a sequence of
job1 ,job2,job3.

Thanks
sunitha

Answer Posted / vijaya

Hi

U can run the job1 then job3 by two methods by using trigger
conditional or by nested condition activity.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the importance of the exception activity in datastage?

628


What are iconv and oconv?

777


Whats difference betweeen operational data stage (ods) and data warehouse?

673


How can we perform the 2nd time extraction of client database without accepting the data which is already loaded in first time extraction?

1703


Differentiate between datastage and informatica?

727






How you can fix the truncated data error in datastage?

1208


explain about citrix scheduling tool in datastage

1812


Where do you see different stages in the designer?

633


if we using two sources having same meta data and how to check the data in two sources is same or not? and if the data is not same i want to abort the job ?how we can do this?

1759


What are the types of containers?

692


root tree will find which is server job and which is parallel job?

1457


Can you implement SCD2 using join, transformer and funnel stage?

1094


how to write server Routine coding?

1669


Describe routines in datastage? Enlist various types of routines.

584


what is the use of surogate key in datastage

1823