hi,
how would i run job1 then job 3 , then job2 in a sequence of
job1 ,job2,job3.
Thanks
sunitha
Answer Posted / vijaya
Hi
U can run the job1 then job3 by two methods by using trigger
conditional or by nested condition activity.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is the importance of the exception activity in datastage?
What are iconv and oconv?
Whats difference betweeen operational data stage (ods) and data warehouse?
How can we perform the 2nd time extraction of client database without accepting the data which is already loaded in first time extraction?
Differentiate between datastage and informatica?
How you can fix the truncated data error in datastage?
explain about citrix scheduling tool in datastage
Where do you see different stages in the designer?
if we using two sources having same meta data and how to check the data in two sources is same or not? and if the data is not same i want to abort the job ?how we can do this?
What are the types of containers?
root tree will find which is server job and which is parallel job?
Can you implement SCD2 using join, transformer and funnel stage?
how to write server Routine coding?
Describe routines in datastage? Enlist various types of routines.
what is the use of surogate key in datastage