Answer Posted / ashish amte
Test strategy is a document and is designed at
organizational level. The strategy may differ from
Organization to Organization. This document basically acts
like a guideline to client by which client understand the
testing process undertaken by organization. The document
contains Test Methodology, Risk Covered, Assumptions,
Resource allocation, Exit criteria and details regarding
the product/project budget.
Preparing the Strategy document is a one time activity.
Since the document is designed at organizational level
there may be least possibility of sharing the document
team. The Test Manger or higher management is responsible
for preparing/releasing and updating the document. As the
client is involved it’s required to take the approval from
there end during initial draft / pre-modifications. The
document also talks about the various conditions if incase
organization fails to deliver in time or if there are new
enhancement were proposed by client
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What do you plan to become after say 2-5yrs (Ex: QA Manager, Why?)
Can you explain process areas in cmmi?
Describe a past experience with implementing a test harness in the development of software.
uses of checklist
There is an opening in our organization Sierra Atlantic, Hyderabad. All Manual test engineers with 2-3 years of experience can forward your resumes to mah_cs82@yahoo.com before May 01, 2008. (Only manual testers) with a covering letter, current CTC and Expected CTC.
Write a set of test cases to test youtube?
Please explain me v-model clearly i want to know how it works and want to know how it use in real time on a project please tell me its urgent and important for me understand .Please tell me my mail id is Chiku_69@yahoo.in Thank u
What is checkpoint? How can you handle the checkpoints?
What is the procedure of manual testing?
Can you explain steps in function points?
What is difference between V-Model and Agile Model?
What is smoke testing and what is sanity?
Please is there any one working with ITR.COM? Having interview with them. Any tips will help.
Can you explain an application boundary?
Why testers wil prepare useracceptance testcases,system testcases and integration testcases,What is the differenece between all this test cases