Consider if there is no Test lead, No Test Manager and QA
Manager. If you are the senior test engineer, you are
getting pressure from the client to give the build. But you
see that, there r 5 high and 5 low sevierity bugs. So, what
you will do and how you interact with the client.
Answer Posted / sastry
I would update the client about the status. If the client
is looking for a high quality product I will get sufficient
time to fix these issues. However sometimes based on the
defect severity and time to market, client may agree to
release with these bugs as known issues
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
pl. give me the list of top jobs website to register i have 2Yrs. Experience in manual testing
Which are the different tests for apparel testing?
What are joins and subjoins in the data bases what is data driven testing what is verification and validation What is Quality Assurance (QA) and Quality Control (QC) Is Verification is related to QA and Validation is related to QC ? which type of model you follow basically in your project what is a use case How to test a Bike how to test a Lift (Elevator). which configuration Management tool do you use which Bug tracking tool do you use explain Bug life cycle what is Regression testing what is ALPHA testing ans BETA testing What types of testings comes under Non functional testing what is TEST DIRECTOR what is CMM and CMM i whar are Expressions in Winrunner What is a Compile module Is it Necessary to open the tool first or the application first after getting a bug what will you do if you add a new object or a new module for the existing application then how will you test the application which Defect tracking tool do you use what is change management What is smoke Testing what is sanity testing A application is given to you but the requirements and functionalities are missing what will you do to start the testing which testing documents will be received by the client
Hi, this is murthysharma. I need very urgently about some terms which are used in use cases? Plz give reply to me, if any body know, It is really very very urgent. 1. what is the difference between basic flow,exception flow and alternative flow? 2.what are non-functional requirements in use cases? 3.what are exceptions, special requirements, business rules, assumptions, constraints. Kindly give me with the example. Bcoz, I am very new to this use cases. thanks in Advance. Regards, M.MurthySharma
what are risks and contigencies(solutions) of an ecommerce (online shopping and bidding project)application?we describe this in Test plan can anyone tell me abt this?
Explain the components of a test plan?
Can you explain usability testing?
I have 2 yrs 10 months experience in manual testing. there is a gap of 3 yrs in between. just 3 months before i rejoined the same company. I am looking for new & better job.What I have to enhance my career to up level, should I have to do Automation course or any other. Guide me properly.
whats main working for tester. and developer, and prject manager.
What is CVS and why it is used?
What is severity and priority of bug? Give some example.
How will you determine when to stop testing?
Why Equivalence Partitioning is called equivalence or what is the significance of equivalence term in ECP?
What is Cyclometric testing?
What is test closure?