what is the difference between PP and PP-PI?
Which one is better and how? Please explain some body in
detail.

Answer Posted / louis

PP --> Is used for Discrete & some times Repetative
Manufacturing wher no Interfacing is required from external
systems. (Typical 'Make-to-Order' scenario's, automotive,
bicycles etc).

PPPI --> Is used where Interfacing whith external Systems
is required. (Example: In the Mining Industy whitch
interface with Conveyor belts, Volume meters/for Water and
Production Quantities etc.) This is typical 'Make-to-Order'
type of production.

Is This Answer Correct ?    3 Yes 25 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is detail scheduling

1355


In lsmw which is most important step?

623


What are traffic lights in mrp?

730


How to attach a drawing for a material to bom ? Is it possible ?

622


What is routing in sap pp?

771






What is the difference between stock transport order and stock transfer order?

598


How requirements( pir, sales order, customer requirement) are reduced after they are produced?

789


What is the planning horizon?

655


Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?

601


Can we create production order without bom and routing ?

664


We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?

647


What is the use of mrp pp evaluations?

663


suppose we have sales order-40, PIR-25,warehouse stock-40, so when we run mrp,what quantity the system displays with MTO & MTS. How?

1873


How can I use variable size items?

655


What is Production scheduling Profile and use of it?

1291