Anybody know the difference of primary file and full
procedural file

Answer Posted / sudhir

Full Procedure File...
FFilename++IPEASF.....L.....A.Device+

FELASAV IF E DISK

Primary File..
FVENDOR3 IP E DISK

Is This Answer Correct ?    7 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Hi Viewers can any body explain me how to update and ahange the already existed data in physical file using subfile ? please explain me with the code if possible?

4214


what are the key words you must use when using a subfile?

694


what is the necessary keyword needed to scroll subfile records?

705


what is the procedure and explain about real time scenario.

1482


When it is desirable to describe files Internally?

1191






Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.

2054


what is *place and *auto keyword in prtf ?plz explain

2730


do you use message subfiles? What are the necessary keywords required coding a message subfile?

690


How to declare the pull button in AS/400..

1884


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1764


How do u design a physical file, when you have 2 Unique fields like for eg in A student file student ID and student examination no both are unique

549


can you debug ile rpg program using isdb?

739


what is the difference between do while and do until?

710


can any one help in hawkeye and turnover or any change management system plzzzzz or send the documents to my mail id :gvsp.as4@gmail.com

1971


explain sflclr, sflend, sfldlt, and sflcsrrrn?

891