9*9 1:4:8 ratio using for p cc work please tell quantity
40mm aggregate ,sand &cement
Answer Posted / manikandan ramia sankaran
1. 9.00m x 9.00m x .15m
= 12.15 m3
12.15/(1+4+8)[x] 1.56 = 1.458m3 of cement
sand = 4 x 1.458 = 5.832 m3 of sand
4omm agg = 8 x 1.458 = 11.664 m3
Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
how to calculate the density for high density concrete ? or is it same as the density of RC?
Why should you consider yourself fit to be hired by jindal steel.
What is the software used in civil engineering?
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
why we are useing plastic under the lean concrete?and whts the advantage?
How to calculate steel for beam slab and column
for pretensioning which will yield first and same for post tensioning?
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
HOw much % of premium on DSR-2013 currently
How much sand and cement requirement for 1 SQM 125mm thickness Brickwork
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
What is Grid floor and mention its advantages ?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
punj loyed and sapurjl palanjl
in one SQM plaster how much Cement and sand consumed in ratio 1:4