Answer Posted / s.a.koushik
In series motor the field and armature winding are in series connection.so when starting what ever the current drawn by the armature winding passes through field winding also.since current flow is not restricted in series circuit.so the amount of flux produced bu field and armature winding will be more enough to produce high torque.(because during starting current drawn by armature winding is high).
Is This Answer Correct ? | 43 Yes | 14 No |
Post New Answer View All Answers
What is the working principle of servo motor? And explain it.
what is accuracy ? in any meters , coils accuracy . how can u defined that ?
What is the important precuations need tocarried out while working with Electrolite in Battery PM?
how to decide the panel size like MDB ,SMDB PANEL SIZES
If i have two 3000 kW motors and the whole facility requires a 10 MVA transformer. What would be better installing two 5 MVA transformers(one for 1 motor ) or just a single 10 MVA transformer for both of them. Give reasons for your answer.
Why MCCB is Getting tripped sometimes when there is no load in the Midnight ?
What is the Surge for 1.1 Phase Induction Motor(For Eg.1Hp) 2.3 Phase Induction Motor(For Eg.1Hp) 3.AirConditioner(For Eg 1Ton) 4.Refrigerator(For Eg 180Ltr or 160kW) 5.Induction Cooker 4. Ceiling Fan
which stabilizer is better ? AVR, Servo Stabilizer, Static stabilizer etc & why explain it
WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY / SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE? WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE OR ON SUM OF ALL TRANSFORMER'S KVA? NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS) REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION? PLEASE ANSWER.
When will you multiply and devide with derating factors to the actual value while sizing the cable?
What is the physical significance of phase.. i.e. what is exactly the meaning in layman's language.. 1 phase, 3 phase etc ???
Please tell me the earthing procedures adopted for the STAR-STAR 3 Phase transformer in india and give a better sugession for earthing
How do we calculate the Out put voltage of generator, after the excitation is being given?
what is ramping rate of generator
how 650 volts creates? where is use?