Testing a new or an altered data processing system with the
same source data that is used in another system. The other
system is considered as the standard of comparison. OR we
can say that parallel testing requires the same input data
be run through two versions of the same application.
Parallel testing should be used when there is uncertainty
regarding the correctness of processing of the new
application. And old and new versions of the applications
are same.
E.g.-
1) Operate the old and new version of the payroll system to
determine that the paychecks from both systems are
reconcilable.
2) Run the old version of the application system to ensure
that the operational status of the old system has been
maintained in the event that problems are encountered in
the new application.
Thanks & Regards
B.Ramyasri
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
PLEASE CAN ANYONE SEND ME THE TEST SCENARIO BASED QUESTIONS FOR 3+ EXPERIENCE IN MANUAL TESTING
Artifacts in design phase of SDLC ?
i looking for the software testing job with the exp of (1.5 yrs ), if anybody knows how to approach the companies ,pls let me know , possible que which will be asked in interview ? pls send me sample resume for testing ....pls do the favour as soon as posible .
What is the limit for test steps?It should be 10/20/30etc
can u merge 10GUI map files into a single GUI map file in winrunner?
I have interview on Guide wire testing. If you please share me.
Please Tell me About Fish-Bone Model. Thanks in Adv.
What do you mean by Unit Testing, Integration Testing, System Testing, and User Acceptance Testing and when do you do them?
hi every one can you send me ISTQB Course material on my Email id deeptimundra997@gmail.com
How can data caching have a negative effect on load testing results?
Suggest some book to learn more test case???
whats main working for tester. and developer, and prject manager.
How to do manual testing of a E-insurance project (end to end process)
What do you do (with the project tasks) when the schedule fails?
When will the testing starts?