how do we calculate quantity of cement , sand and
aggregates in 1 m3 of M30 grade concrete ?

Answer Posted / rajarshi basu

The approach by Sjtbehera is totally correct but has some
little silly mistakes...I have tried to give a rectified
solution.

In the case M30 design mix, the quantities of cement,sand
and aggregates cannot be calculated as it is a variable
quantity.It depends upon the Mix designer how much quantity
of cement,sand and aggregates he will employ.His only
intention would be to design a mix whose specified
characteristic compressive strength at 28 days=30 N/sq.mm
But in case of nominal mix we can use 1:1:2
Let us consider a volume of 10 cu. m (Wet concrete)

It is difficult to access exactly the amount of each
material required to produce 10 cu m of wet concrete when
deposited in place.
Hence to convert the wet volume into dry volume,
Increase by 54 % to account for shrinkage and wastage

Thus it becomes=15.4 cu. m (Variable upto 15.70)

Calculating cement, sand and aggregates in the mix:
Total summation of proportion=1+1+2=4

Cement = 15.4/4= 3.85 cu. m =3.85/0.0347=110 bags
Sand=15.4/4=3.85 cu. m
Aggregates(20mm to 6mm)=15.4 x (2/4)=7.70 cum

Hope u have understood and the mistake is clarified!!!

Is This Answer Correct ?    174 Yes 65 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to control PQI (Project Quality Index)

9825


is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.

1918


What Reinforcements Are Used In The Process Of Prestressing?

839


Rate analysis of Vitrified tile in cement mortor 1:3

3935


What do you meant by gui?

721






Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?

1584


how meny typs of renging rod?

1790


how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???

1464


In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

1812


Why concrete barriers have curved surface profiles?

796


Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai

2581


please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering

1063


Curing time for 1)R.C.C slab 2)B.W 3)Plastering

1644


Which stone is best for wall construction Laterite Stone or Cement Blocks

1312


What you understand by richter scale?

710