is traceability matrix prepared by jr tester or sr tester
or test lead?

Answer Posted / santhosh

all the above are correct my point of view.

Generally Traceability matrix is prepared by senior test
lead.It can be prepared with the help of Test Case Document
and PRD(Project Requirement Document in which all the
requirements are mentioned).

so The matrix is prepared in such a way that Every
requirement in prd should be covered by one or more test cases.

So ultimately we prepared this only to verify the test coverage.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1.What types of documents would you need for QA, QC, and Testing?

4927


what are the different methods to test a product in 'Japanese' language? NOTE:User is unable to perform basic functionalities while using the app..(copy, paste, text selection etc.)

1500


hi, I m looking for a career in manual web testing. so PLZ anybody who have the practical knowledge of dis field help me. GIVE ME UR MAIL ID so that i can ask regarding some doubts. my MAIL ID is ankurtester819@gmail.com

1473


When we use integration testing for any new system so why we required system testing.

1554


Can you explain steps in function points?

656






what r the 5 major defects that u found in ur shopping related project?

1426


What is the purpose of test strategy?

701


in the account there is 10,000 rupees and i entered 20000, in this case how will you test the application

1263


What is checkpoint? How can you handle the checkpoints?

2002


What were the major challenges u faced while testing

2061


What are the two main categories of software testing?

692


What is your daily process? I have 2+EXP IN MANUAL TESTING.PLEASE SUGGEST ME HOW i ANSWER

1820


Tell me about Agile scrum and what is your role in Scrum ?

1361


PLEASE CAN ANYONE SEND ME THE TEST SCENARIO BASED QUESTIONS FOR 3+ EXPERIENCE IN MANUAL TESTING

3879


Being an Manual tester, what will be the role or activity in test plan ?

1608