Give the entire process or procedure of SAP SD testing along
with detailed procedure explanation steps and t-codes and
path if any? Give as many examples as possible from your
real time project data? Plz give more emphasis on
explanation, procedure and real time examples from your
project data. Please answer this question asap.... Its
Urgent.... Looking forward for your express reply...I have
interview within 1-2 days. So, give reply to this query
asap.. I would be very grateful to you for your timely
help.Thanks in advance. Regards
Answer Posted / subha
Once the project is finalised and ready for moving into
production server we do 4 different types of testign to
remiove bugs ifany
they are
1. Unit testing here we do the complete testing of the
cycle and see that the if any errors are theere are reduced
or elmiated completely
2. integration testing:
HERE WE INTEGRATE EACH OF THE MODULE WITH THE OTHER
MODULES AND SEE THATTHECYCLE IS COMPLETE RUN
3.Regression testing here we see that software built by us
goes in handy with the other software if any in palce
4. UAT : USER ACCEPTANCE TESTIGN WHERE THE USER USES THIS
SOFTWARE
the bugs are identiofed at each stp with / h and are rmemoved
once the cylce is all set to go it ti moved to production
server
this is go live
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
What is the client no of SAND BOX.GOLDEN CLIENT, UNIT TESTING,ENDUSER TRAINNING AND PRODUCTION SERVER?????
How to create the source and target database connections in the server manager?
Define the customer taxes in ovk3, you will maintain the tax code in customer master.
i faced one question. when new configuration we do what is the logic behind there?
What are the configurations steps for packing?
At what places availability check performed? is it done at invoice level also ? if yes what are the scenarios to perform availability check at invoice level? what are the settings to be done to perform to check at invoice level?
What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling
Intercompany sales I am working on intercompany sales. How do I create material in both company codes?
Define the material taxes in ovk4, which will then be maintain in material master.
How many shipping points can you assign to a sales organization?
What is the procedure of Make to order configuration. Plz answer me, Thanks in advance.
What is physical inventory management?
After setting up a batch job (schedule the backlog report) by T Code SM36, i am getting error mail from user saying that, the reports r not recieving to his mail box, can any one help me regading this, how to resolve?.....it will be greate help.. Thanks
What is the difference between vk11 and vk31?
Subtotals in pricing how do the subtotals that have carry over value kompkzwi1, komp-kzwi2, work with respect to condition types?