WHICH KIND OF ADDITIONAL PILE DRIVEN TO INCREASE THE
CAPACITY OF SUPPORTING LOADS ON VERTICAL PILES

Answer Posted / lokesh kulal

Anchor pile at 45degree

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the dimensions of river sand truck trailer or trolly ?

3379


how to find ssm in foundation?

1435


what is idealized curve for concrere and steel

1838


What is the Maximum %age of Steel in columns and beams ?

722


What Reinforcements Are Used In The Process Of Prestressing?

841






primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above

1646


i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh

1840


how many shuttering material required for 1000 sq.m built up area.

1879


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

1663


Which stone is best for wall construction Laterite Stone or Cement Blocks

1319


how to calculate the dry wt of sand and cement for a required design mix?for ex:M20

2117


what is the mix design for M:60 with micro silica andmetakaoline?

1808


In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.

3540


At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.

1688


it is possiblee to produce concrete with out cracks...

1480