How do u find Synchronization problems manually?

Answer Posted / usha

synchronization means to wait till the applied operation
completes, after that continue the next operation. If we
conduct testing manually then only we uses this. If we
conduct manual testing, we should wait till the applied
operation completes.

We are not faces these problems manually, i think.

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how recovery manager works in winrunner

1544


Explain accessibility testing and its importance in the present scenario.

666


Are there more defects in the design phase or in the coding phase?

917


which test strategy your are fallowing in your company?which documents u r using in software development life cycle?

1812


What are the advantages of black box testing?

659






Explain thread testing.

644


Hi Frnds, this is Aman.. can anybody tell me plz what kind of QA Interview questions are asked by IDS Infotech Ltd., Chandigarh? I have lil bit experience only in Manual Testing.. Plz answer my question as soon as possible.. Thnx in advance..

1903


hi this is satish can some one help me out by sending the maxium notes on client sesrver ,web server and company architechture project hirearchy and company hirearchy i will happy to recive the answers as early as possible

1709


what is the challenging position faced in the testing not in point of management point of view it must be in the point of while testing the application?

4011


What is Test Design?

1733


Write 10 test scenarios to test remember me checkbox present in login window

975


What is the difference between white box, black box, and gray box testing?

634


Can you explain the pdca cycle and where testing fits in?

763


1.Acceptance testing involves procedures for identifying acceptance criteria for interim life cycle products and for accepting them.is that? 2.Acceptance testing occurs only at the end point of the development process; it should be an ongoing activity that test both interim and final products.is it?

1848


What is a test server?

711