what is the proportion of m20 grde concrete? also how much
water is required for this proportions? As there were any
formula for water-quantity?
Answer Posted / suraj
water required in concrete is 28%of cement and 5% of total aggregate.
| Is This Answer Correct ? | 9 Yes | 3 No |
Post New Answer View All Answers
What is meant by cad?
TELL ME THE EQUATION FOR OGEE SPILLWAY
important question on stones
what"s the sort of beams?
What does a construction cost covers and what does not?
cause of cylinder test failure
How do we calculate absolute pressure?
What is rate of concrete surface rendering work per sqm
How many are the types of joints?
What do you mean by bond? What are the different types of bonds?
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
The definition of national highway
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
Which purpose we use deck anchor in bridges?
Define What is rigging?