Explain the differences between Return Sales Order &
Credit memo request in detailed along with detailed
procedur, t-codes & steps and include your real time live
data examples from your project? Please reply asap...
Urgent!!!! Waiting for your response eagerly... Thanks in
advance
Answer Posted / subha
paul
2 things to note
You use RL AS DELIVERY
RE IS NOT FOR BILLING IT IS FOR retrun order that you
create for retrun sales order and need to give appropiate
reson for rejection in the sals order
You dont have to post the material back to MB1C as that is
carried by MM AND PP DEPT
you also need to reverse PGI
and at billing you dont use f2 but use gs as if the amt is
collected or customer is billied then you need to raise
credit invoice
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is the difference between pgi cancellation and returns order?
how to and where to maintain copy controls
Can you 'block' a transaction for a material that is 'flagged for deletion'?
What is sap sd?
A is your client; b is your client’s customer. B need x material, but x material is now out of stock, then you can solve this problem?
Hi All, I am taking the SAP SD course and need some live case studies for my practice, can any one help me in this regard. You can mail it on my mail id: simkim4u@gmail.com Thanks, Sameer
how you can assign distribution channel to sales organization?
What is the difference between the item proposal and dynamic proposal?
List out the five features you can control for the sale document type?
Hi Friends, Can you please let me know the difference between user exist and Routines
how can I do (config)? if my product category like this 1 product brand exam 101 brand A, 102 brand B 2 product type exam 501 type water, 502 type resin my sale deal is every customer can buy mix product category if buy 400.00 each can get free goods 10.00 each from any product in mix cat exam customer order line brand type quantity 1 101 501 100.00 2 101 502 100.00 3 102 501 100.00 4 102 502 100.00 mean customer meet target can get free 10.00 each but customer can select material in mix category chot trinnamaitip
What two ways of number assignment for documents or master data do you know? Explain the difference between them.
What are the configurations steps for packing?
From which documents can you create a performa invoice?
In Order - what have you done exactly, did you do the entire setup in SAP, and if yes, can you walk me through it?