What Tester should do after getting Requirement Doc?

Answer Posted / ramsha

1) First we should know the level of testing (ex: in safety
Critical systems follow DO-178B Level A to D or SIL Level 1
to 5).
2) Clearly understand the testing.
3) As mentioned in the SVP follow testing process
4) Should know Its a delta (partial) or full testing
5) Based on testing tool develop test script on the
specified language/script
6) Design test cases
7) List out assumption and constraints
8) develop test scripts
9) execute and collect the report
10) Document the result, justify the valid failure otherwise
report it.

Is This Answer Correct ?    7 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is Difference between Test Strategy and Test Methodology?

1735


if go through 1 or 2 projects clearly,then i feel comfortable to search the job,please help me

1508


Artifacts in design phase of SDLC ?

3080


What are the differences between web applications and client and server applications?

684


What are the basic forms of variations?

1690






what are the prerequisite conditins to test clientserver and web applications

1600


tell me some major and minor defects in ur net banking project?

3162


What is software review?

808


What is reverse engineering?

747


What is Online gaming, payment gateway development, hosting and custom software development services.

1431


Hi, My name is Dinesh.I want to prepare for ISTQB certification , So can anyone please email me the syllabus of it and what is criteria for giving exam.Please email me answers at: dinesh0323@live.com

4233


Can you explain decision tables?

672


Can list out some disadvantages of manual testing?

676


What is Traditional testing & Object Oriented testing?

1970


ANY ONE HAS ATTENDED THE INTERVIEW FOR WIT INNOVATION P LTD? THEN KINDLY LET ME KNOW ABOUT THE INTERVIEW PROCESS AND QUESTIONS ASKED.

1742