concrete ratio=1:2:4
area=1cum
1+52%=1.52cum(add the extra 52% for dry material)
cement=1.52/(1+2+4)=0.217cum=(0.217/0.035)=6.2bags
(per bag cement volume=0.035cum)
sand=1.52/2=0.76cum=(0.76/0.028)=27.14cft
(0.028 is a conversion factor)
aggrigate=1.52/4=0.38cum=(0.38/0.028)=13.57cft
(0.028 is a conversion factor)
finaly=
cement use in per 1 cum=6.2bags
sand use in per 1 cum=27.14cft
aggrigate use in per 1 cum=13.57cft
| Is This Answer Correct ? | 4 Yes | 11 No |
Post New Answer View All Answers
calculate the quantity of water for 1:6 cement mortar
What is the basic difference between OPC
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
in 100 cft = 1350 bricks in 100 cft = ? bloks
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
Which Types Of Bricks ?
How do we calculate the power of centrifugal pump?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
How much cement and water required for cement selery????
what is work of planning deptt. in any construction compny (in road project)
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)