how to calculate the required qantities of cement, Sand and
aggrigate to prepare 1 Cum of concrete mix 1:2:4
Answer Posted / pritesh .c . bhoi
mix desighn = 1:2:4= 7
quantity is 1 cum add 52% westage and shreankage
so 152 cum
cement = 1*1.52/(7)=0.21714 cum (dry volume)
volume of one bag is 0.0347 cum
so no of bags are 0.21714/0.0347= 6.25 nos say7 numbers
bags are required
sand = 2*1.52/(7)=0.43428 cum
course aggregates = 4*1.52/(7)=0.86857 cum so conclution
is
cement =7 nos bags
sand =0.43428 cum
course aggregates =0.86857 cum
if any mistake please informed . thank you
Is This Answer Correct ? | 24 Yes | 9 No |
Post New Answer View All Answers
What is a hatch patterns?
what is difference between fluidity and workability also how palsticizer works
about higyway engineering
to draw bm diagrams for portal frames under different loadings//
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
what is smart building materials?
Is it possible to make a feature using an overdefined sketch?
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
What is meant by engineering drawing?
What you understand by building codes?
how to absorb to site basic corrections? which are the important correction?
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure