how to calculate the required qantities of cement, Sand and
aggrigate to prepare 1 Cum of concrete mix 1:2:4
Answer Posted / pritesh .c . bhoi
mix desighn = 1:2:4= 7
quantity is 1 cum add 52% westage and shreankage
so 152 cum
cement = 1*1.52/(7)=0.21714 cum (dry volume)
volume of one bag is 0.0347 cum
so no of bags are 0.21714/0.0347= 6.25 nos say7 numbers
bags are required
sand = 2*1.52/(7)=0.43428 cum
course aggregates = 4*1.52/(7)=0.86857 cum so conclution
is
cement =7 nos bags
sand =0.43428 cum
course aggregates =0.86857 cum
if any mistake please informed . thank you
| Is This Answer Correct ? | 24 Yes | 9 No |
Post New Answer View All Answers
why we use 19x9x9and 20x10x10 but not other
how to check and keep control on the wastage of material at site
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
Minimum and maximum size of the building components
sir how can we find the cement and sand required for making 4" drop
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
what are the code used for residental building?
What is the absolute pressure scale?
hi guys what happens if you are absent for a supplymentry exam?
What happens to Load at yielding ?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
How to calculate the quantity of ingredients of M20 grade concrete?
what is moment-curvature relationship in semi rigid connections??
What are the different approaches in designing the floors of the service reservoirs?
What is absolute coordinates?