Answer Posted / rama
order types are divided into subcategories like production
order (normal), process order (for process industries
food ,chemicals), network orders (in ps systems),rework
order etc.
we can collect the costing information for these sub
categories.
Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
Tell one biggest task for you
Mention what is the use of t-code cs20 in bom?
If u maintain sub-contacting where and how will be reflect
What is primary cost and secondary cost?
Can we have more than 6 standard values in standard value key?
What are the key fields in MRP views?
Define mrp controller
How to insert an inspection checkpoint at the end of an operation?
How do I default it 41?
How the processing time is calculated in a wc when both labor, machine categories exist?
Which tool you are using
What is Phantom Assembly?
Have you used Pull list or back flushing in REM?
What are the customer activities followed for pp module ?
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?