Answer Posted / rama
order types are divided into subcategories like production
order (normal), process order (for process industries
food ,chemicals), network orders (in ps systems),rework
order etc.
we can collect the costing information for these sub
categories.
| Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
Is it possible to convert a 'multiple bom' into a 'variant bom'?
what is the major ticket in your experience
what is alternative item group
What is a ‘bom’?
What is MRP procedure
What is the need of mrp list if the stock requirement list is already given?
What are all the ‘technical types of bom’?
• How are basic order dates determined?
Can’t one material be assigned to more than one operation in a routine?
what are Standard keys
Differentiate ‘variant bom’ from ‘multiple bom’?
Difference between standard cost and variable cost.
What is MTS and MTO and the difference between them?
Difference between MD01, MD02 and MD03.
What do you do to run MRP for just one MRP Controller?