what is document flow? and in which table document flow data
wil be store? its a recently asked question from wipro
technologies. so pls guide me in detail
Answer Posted / g
Document Flow shows if a document is open, being processed or completed.It also show references for a document.
You can check the document flow if you go to "Environment" tab and click on "Check Document flow"
Sales Document flow is stored in VBFA table.
Best
G
Is This Answer Correct ? | 16 Yes | 0 No |
Post New Answer View All Answers
How is credit control determined in sap?
How many pricing procedures you have configured in the system and what are their purposes?
Can one business area be valid for several company codes?
How to change chart of accounts of company code after making several sales orders and delivery?
Explain what is condition types? What is the path to define condition type in sap for pricing?
Can you share master data between several sales areas?
At which levels in the sales document can you have different incompletion procedures?
How to have one pricing at sales order level and different pricing at invoice level? what are the configuration to be done for this?
How to maintain number ranges for sales document types?
what are the two places where you need to configure cin (country version india)?
Hai, Please post all SAP SD Q&A to my emailid: nagendra15061975@gmail.com
What is a typical duration and cost of an sap transportation management implementation? : transportation management
why tolerance groups are to be define in sap?
if i have a CRM in sales area, sales org,dis channel,division can i create a sales order for this customer.in sales area sales org,dis channel,division with out extending CRM for sales org,dis channel,division? if yes please explain.
What’s forward scheduling and backward scheduling activator? There’s a concept called forward scheduling and backward scheduling logic when you do an availability check whenever your order is created system will check whether it’s forward scheduling or backward scheduling, if it’s fatal we have a concept of how is it working, how is that you created as part of your available promise concept? Whatever that date is being considered as part of the logic, whatever the date that is configured or we maintain the data to say know that system tell to create this output back scheduling