What is the basics of Agile/Scrum development?

Answer Posted / surya

Agile methodology is used to minimize the risk or surprise at the end of the project.
A project is divided into a small projects which has its own SDLC. In case of any failure, the impact will be very minimal i.e. impact will be only on that specific bit of the project.

Scrum is to maintain the transferancy of the progress with the stake holders and to cross check the achievements of the milestones.

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How would you deal with a bug that no one wants to fix? Both the SDE and his lead have said they won?t fix it?

2867


Tell about current project ?

2204


What is the project management structure in your project? Is a PL assigned to the project?

2026


Test the save dialog in Notepad?

4176


Write the test cases for instr function?

634






What is the role of CLR in ASP.NET?

3190


Write a function that inserts an integer into a linked list in ascending order. Write the test cases for this function.

5118


Tell about yourself and job ?

2078


Can any one please give me an effective format for designing a functional specification and technical specification sheet for a software developemnt related company asap...it would be highly useful for my final year project.

2441


funds flows analysis how to prepare for interview

1034


How do you rate yourself in c#,vb.net,Asp.net,oracle,sql server ?

4961


create a flow diagram up to 2 levels for hospital management

3217


Did you used crystal reports? Do you have sufficient knowledge on crystal reports?

2151


Assignment A software house got a project to automate sales/purchase department of a furniture store. The store management is clearly transferred their requirements to the software house management. There is no chance of changing the requirements afterwards. Software house management use waterfall process model to make the project. Given is the progress flow of water-fall process model In waterfall process model, the deliverable (document) produced in one phase serves as an input to the next phase. Suppose you are a project manager who is leading this project. It is decided to work and complete the project using waterfall process model approach. You are required to develop a plan in which the key task is to decide the deliverable that should be built during and after completion of each phase. Also give a description or required contents that must be included in those deliverables. You are not supposed to make the complete project. All you are required to do is to make a Project plan. In that, you need to give a set of deliverables (documents) which according to you, should be developed in each of the phase (Requirements, Designing, implementation, Testing, Maintenance). Also provide contents which should be there in each deliverable. The contents should be clear and have brief explanation. Note:: There are one folder and one file in the attached folder. The file is named as Assignment 4 write-up which is your assignment write-up. The other folder named Project deliverables is the folder in which you are required to organize and place your deliverables. Name of the document/deliverable saved in each folder should be mentioned in the file named checklist (This file is placed in the “Project deliverables” folder) For Example If you produce a deliverable named Requirement Specification (RS) in the “Requirements” phase. You need to do following tasks 1) Finalize the RS contents 2) Save the file in sub-folder named Requirements 3) Write the name of this document in the checklist file under the heading Requirements. Similarly, you need to make and save deliverables of each phase. Not all phases contain one deliverable. There must be some phases having more than one deliverables. PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ? CHECKLIST ARE: 1-Requirements 2- Designing 3- Implementation 4- Testing 5- Maintenance

6469


Explain dll hell?

654