Why we use Y-Y connection in power transformer (8-10 MVA,
132 kV to 11 KV)and D-y in distribution transformer (2 MVA,
11 KV to 440 Volts)?
Answer Posted / rajesh kumar
we use y-y connection in power transformer 132kv as we know
that in star connection line voltage is-1.732.phase
voltage.so it is easy to insulate the winding as the
voltage level is low.and cost is less due to degrading of
insulation.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is the current carrying capacity of 0SWG,3SWG,10 & 12 SWG solid bare overhead copper conductors?
TCS IS IT COMPANY THEN WHY DO THEY NEED ELECTRICAL &ELECTRONICS ENGINEERS?
If I want to connect a capacitor bank on the HT side of a 11kV/415V, 3 phase delta-star distribution transformer to supply Reactive power to it..what practical specifications of a Capacitor bank that can i've??please reply..
On what cycle does thermal power plant operate?
WHAT IS counter flux IN CT?
What is Phase margin?
how we test a 3 phase motor on single phase supply....? HOW WE RUN A 3 PHASE MOTOR ON SNIGLE PHASE. supply for testing..? how we verify of a 3 phase motors 6 wire & name thame a1/a2/a3..b1/b2/b3 and c1/c2/c3 for connecting star delta starter ........i have only 1 phase supply ? help forum..........
I COMPLITED MY B.TECH AND 10TH CLASS WITH 70%MARKS BUT 12TH CLASS 55%MARKS..CAN I GET INDIAN RAILWAY RECUREMENT EXAMINATION?
What should be the protection scheme for a 15kw, 3-phase motor working in a lathe machine.
what is the transformer rush current?
How can we decide cable size from HT panel to Transformer? Please give you reply with some examples.
Why 11kv to be generated in generation station
tell me about roaster switch .& what is the function in transmission & distribution?
what is the function of Moulded case circuit breaker, why it is called Moulded?
why the check zone and main zone are used for Busbar Protn. scheem?