Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate transformer capacity requirement for a
project site?

Answer Posted / mahesh sali

THE CAPACITY OF TRANSFORMER USED FOR SITE APPLICATION SHALL
BE CALCULATED BY FOLLOWING CONSIDERATION;

CAL.TOTAL CONNECTED LOAD
BASE ON KW & ASSUMATION OF 0.8 P.F.
CAL. THE KVA/ MVA RATING OF X'MER I.E. KW/0.8
AFTER GETTING KVA/MVA ADD THE 20% IN CAL.KAV/MVA

I.E. KVA/MVA + 0.2*KVA/MVA

20% EXTRA AS PER IEEE RULE

AS PER IEEE NORM ,UR TRANSFORMER SHOULD BE LOADED AT 80% OF
UR FULL CAPACITY OF UR TRANSFOMER.

I HOPE ABOVE INF. IS SUFFICIENT.

THANKING U

Is This Answer Correct ?    26 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

bsnl tta exam question

1885


How to do cable earhing? whether by grounding Armour to ground or by running extra G.I wire along with cable? which one is preferred mostly amoung them? If the second one is more preferable how many GI wires to be run along with cable (1 or 2)?

2147


why are installed water leakage detection system data centers & server rooms

2401


Transformer how to maintaince a check b check c check d check

2089


How to calculate of maximum demand if given 628kw, 785kva, 0.8 p.f.

1661


Can Anyone Answer anyone of these ? Q1) why direct SOLUTION of Load Flow Studies in Not Possile ? Q2)Why majority of Buses in power system are load buses Q3)Why one of the buses in Power system is taken as reference bus (slack or swing) Bus ? Q4)Bus Admittance Matrix is a sparce (means it contains some zero elements ) matrix , give reason

1927


what is the advantage of connecting capacitors in delta than in star?

2116


what is the role and fuction of automatic transfer switch in rotary ups

1958


WHAT IS DEAD END IN PROTECTION?

2605


why 15 kw motor winding resistance is low then 5 kw motor winding resistance?

2839


what is the use of the puls transformer in UPS & how it works???????????

2228


What is the fault or needs to be done when frequency in ac drives is not changing?

1666


hi friends this is a newcomer in your community of enthusiastic peoples. i am preparing for SSC (CPWD JUNIOE ENGG EXAM FOR ELECTRICAL) pls guide me on the same how to crack it? PLS LET ME KNOW IS ANYONE THERE WHO PASED IT? CAN I GET THE QUESTION PAPERS OF PREVIOUS EXAMINATIONS?

2243


for what voltage will reactive power be largest in 380 kv line : a) 375kv b)380kv c)385kv

1484


what are the advantages and disadvantages of oil filled cables over XLPE cables

19555