How to configure 5 system landscape?
1 deve 2 quality and 2 production?
Answer Posted / s.m.feroz ahmed
Hi,
First of all your question is wrong.
Sap Architecture is defined in such a manner that If all 3
layers come in a single system then that system is called
as Single System Landscape.In this manner we have 3 system
landscape and 4 system landscape.
Single System LandScape is defined as when all the 3 layers
come in a single system as below :
1) Presentation Layer
2)Application Layer
3) Data Layer
If all the above 3 layers come in a single system then that
system is called as Single System LandScape.
If 2 layers come in one system and another layer comes in
another system then that system is called as 2 System
Landscape
for example :one system will contain Presentation as well
as Application layer and 2 system will contain only Data
layer .
If all the 3 layers come in 3 different systems then that
system is defined as 3 system landscape.
The 4th layer is defined as if SAPAS layer in which one
will find InternetLayer along with these 3 layers for
communication between different locations and this layer is
called as 4 system landscape.
The Scenario you have mentioned like 1 dev,2 quality and 2
production is a 3 system landscape and it is not 5 system
landscape.
Is This Answer Correct ? | 5 Yes | 22 No |
Post New Answer View All Answers
Explain what is the importance of table t000?
What is SSO? How to configure SSO?
How you will rate yourself in SAP, Oracle from a scale 1 - 10?
If I want only transaction data to be copied.What profile should I select, while doing local client copy within the same apllication server. Else is there any other way to perform above task?
A transport is imported into QAS in 2 min. time the same transport when imported into PRD is taking more than 20 min. why? What to do?
What is sap single stack system?
what are the pros and cons of auto extend of table spaces?
what is the difference between with core
how can we set a/r a/p netting for inter company code transactions? is it possible to do? if yes, give the solution?
What are the tools to install java patches?
At os level how you can change the number of work process? How you can analyze the status of work process at os level?
What are the key activities that you perform as part of sap basis support?
I also wanna work with Webdynpros? What are the requirements? I mean SAP 4.7 ee or ECC 5 or 6? Netweaver developer Studio? Also with win 2003 i have the activation problem every month. SO do i get a cd that doesnt ask for the activation? i have win 2000 but can it be installed on HP pavilion laptops that are coming preinstalled with Vista OS?
Where will u find transport error logs?
I want to change five dialog work processes into batch. Where can I do this?