Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Any bopdy tell me how to prepare rate analysis for
Centering and shuttering for RAFT FOUNDATION, SUSPENDED
FLOORS, STAIR CASES, RETAINING WALLS, SHEAR WALL and COLUMNS

Answer Posted / praman kumar srivastava

Providing, erecting, fixing in position striking/ removing
and cleaning shuttering and centering for formwork in
foundation and Plinth at all locations for all shapes
inclufing chamfers, camber, splays, keys, wedges, props,
rail, bracing , brackets, cutti
Foundation. For 10.8 Sqmt Area (Based on Physical Analysis)

Material :
Ply Wood Sqmt 11.000 538.000 5918.000
Nut Bolts, Balli Battens etc LS
1095.000

For 15 Repetation 7013.000
For 1 467.533

Labour :
Carpenter I Class Nos 0.750 175.000 131.250
Beldar skilled Nos 1.500 135.000 202.500
Shuttering Oil LS 1.000 33.400 33.400
Sundries I Time 16.700 1.690 28.223
862.906
Add for water charges @ 1%
8.629
Total 871.535
Add for contractor's profit and overheads @ 10%
148.161
Cost for 10.8 sqm 1019.696
Cost of 01 Sqmt 94.416
Say 94

Is This Answer Correct ?    7 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the Types Of DPC and its Thickness used?

1448


What is the difference between Fe 500, Fe 500 D and Fe 515.

4080


2. What are the advantages of your present job, things you like about it?

3133


Where will be the maximum bending moment in a TEE Beam?

7578


wat would be the probable interview questions and GD topics for IOCL exam?

9823


how to calculate spacing rod in column

1970


how to calculate the scour depth

2959


how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?

1633


How to find beam R/F cutting length

1844


what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.

2620


How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?

2051


if the nitrates more than 45mg/l in water lead to disease then what is it called

2929


How do you change a dimension value in solidsworks?

1251


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

2522


How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9

2083