how cubic feet cement,sand,aggregate required for 1 cubic feet
ratio=1,1.5,3
Answer Posted / r.suresh
cement= 11kg
sand = .012cuft
aggregate=.024cuft
Is This Answer Correct ? | 9 Yes | 11 No |
Post New Answer View All Answers
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
brickwork labour rate per cum ?
Write short note on construction programme for pile foundation.
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
What is construction mitigation management?
What is the compressive strength of fly ash bricks?
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
What should be the standard roof height like to be?
according to the painting co efficient, we should take the one side of doors (or) windows or both sides?
what is the specific gravity of rubble in plum concert
what is detail procedure of eccentric footing? plz. give solved exmple?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
Define What does civil status mean?