9*9 1:4:8 ratio using for p cc work please tell quantity
40mm aggregate ,sand &cement
Answer Posted / n.lakshmanan
9*9*.100=8.1m3
cement-26.244Bags
sand-67.29cft
40mm aggregate-134.58cft
Is This Answer Correct ? | 0 Yes | 6 No |
Post New Answer View All Answers
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
In reclamation works what are the importance of geotextiles and sand?
What is the different type of slump test indications?
Which tests are performed on soil to decide the type of foundation to be provided.
indian standard split spoon sampler
Consumption of Binding wire for fixing of cover block in vertical surface
what is castigliano theaorem
what is the effect of duration of earth quake on framed structures ?
List out some of the checking’s, done at the completion of construction?
What is rate of concrete surface rendering work per sqm
VAT and CST ? Which benefits for buyer ? Why benefits?
residential projects,structural.
How do you calculate reinforcement weight of steel?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
what is mc arther pile?